Offshore wind
40m PMC Logistics System
Uptime 40m/ 45m customed designed for personnel transfer from vessel to fixed or floating installations, typically offshore Wind Turbine Installation Vessels (WTIV). Design built based on our extensive experience within large range logistics solutions.
Uptime 40m/ 45m can be equipped with functions and arranged for flexible and safe operation.
FEATURES OF THE 40m
Radio-controlled, local or wheelhouse operator position
Transfer lines
All-electric drive
DNV-ST-0358 certification, Type 3
Alternatively ABS, BV or CR.
Illustration
