Opens in a new tab

23.4/25m AMC Logistics System

Offshore Wind

23.4/25m AMC Logistics System

Uptime 23.4/25m has been the branch standard for many years, chosen by many shipowners and operators from around the world. This was the selected solution installed on the world's first Service Operation Vessel, Seaway Moxie, even before the market acknowledged the ship term type SOV. Up until today, the 23.4/25m solution is still selected for offshore wind projects both for construction support and service operation vessels.

Uptime 23.4/25m can be equipped with a wide range of accessories for a flexible and safe operation.

FEATURES OF THE 23.4/25m

Elevator Tower

Fixed, modular or telescopic pedestal

Crane function

Transfer lines

Electric or RC trolleys for cargo logistics

DNV-ST-0358 certification, Type 1 and 2

EX approved

Walk-to-work in action