57.4 m AMC

Oil & Gas
57.4 m AMC
Setting a new benchmark for offshore access, Uptime delivered the world’s largest 57.4 m active motion compensated logistics system for Edda Fortis..
The system is designed and can be delivered compliant to DNV-ST-0358 Type 1 (uncontrolled/ controlled flow of people).
FEATURES OF THE 57.4m
Autonomous landing
Fixed, modular or telescopic pedestal
Walkway, stairs or elevator tower
Transfer lines
Cone landing
DNV-ST-0358 certification, Type 1
Alternatively ABS, BV or CR.
EX approved